Plastering is finished and plumbing will be next, after that paint, flooring and tile. The toilets arrived today and the paint is coming.
The rooms have great airflow and stay cool throughout the day because we are planting on the roof.
The walls go up.
We used 4" hollowblock, but the ceiling is precast for strength and durability on an economical scale.
The school rooms need finishing, but the cabinet is going in.
The plans as drawn by the civil engineer.