Saturday, April 26, 2008

Pray for the construction of Aloha House

Plastering is finished and plumbing will be next, after that paint, flooring and tile. The toilets arrived today and the paint is coming.

Pray for the construction of Aloha House

The rooms have great airflow and stay cool throughout the day because we are planting on the roof.

Pray for the construction of Aloha House

The walls go up.

Pray for the construction of Aloha House

We used 4" hollowblock, but the ceiling is precast for strength and durability on an economical scale.

Pray for the construction of Aloha House

The school rooms need finishing, but the cabinet is going in.

Pray for the construction of Aloha House

The plans as drawn by the civil engineer.